STT NEEDS ========= initial alignment of the detector with the beam: detector limit determining factor STT offset<1 mm acceptance loss due to tracks that cross sectors STT angle<300 urad z correction based on barrel number CFT offset need to know the beam trajectory to sufficient precision. This may requires a survey program similar to that planned by CDF. => understand that we can place the entire 5000 ton detector this precisely or allow for position adjustment of the tracker. In order to maintain this alignment we will implement a feedback mechanism a la CDF. In run I, the dynamic range of the relative accelerator-detector motion was too small. It appears that in Run II, the dynamic range of the beam position control is larger and may be sufficient for most of our needs. However, caution may be advisable since these numbers are estimates which have undergone substantial variation. To be on the safe side, we have to also foresee the possibility that the central tracker has to be repositioned during the run. REQUIRED ACTION =============== Need to make preparations which will allow positioning of the central tracker to within the required precision, and also think of a scheme which will allow repositioning later in the run if needed.